Attached Lifting Scaffold System

Attached Lifting Scaffold System

Attached Lifting Scaffold System is a high-rise auto-lifting solution, made of Q355 steel. Electric hoists enable 0.5m/min synchronous lifting (no disassembly/reassembly), 80% faster than traditional systems.​ 30kN/m² load fits 10-40 story buildings. Anti-fall nets + guardrails ensure safety; 80μm galvanizing resists corrosion (1800h salt-spray). 200+ reuses—ideal for high-rise curtain wall, concrete pouring projects!
Send Inquiry
Description
Technical Parameters

Shaanxi Flourish Industrial Co., Ltd. – Attached Lifting Scaffold System

With over 25 years of engineering practice in high-rise construction, Shaanxi Flourish Industrial Co., Ltd. presents its Attached Lifting Scaffold System-a full-steel, intelligent climbing solution purpose-built for projects ranging from 10 to 40 stories. Engineered to outperform conventional tube-and-coupler scaffolding and lightweight integrated platforms, this system delivers higher load capacity, faster lifting cycles, and multi-layered safety assurance.

 

Products Description

1.Product Overview

The Attached Lifting Scaffold System integrates mechanical lifting, structural support, and real-time monitoring into a unified platform. Its modular design supports rapid assembly, repeated reuse, and stable operation under heavy-load conditions, making it a practical choice for high-rise facade work, concrete pouring, and material handling.

2.Core Advantages (High-Rise Specialized Design)

2.1 Intelligent Synchronous Lifting

  • Equipped with dual-drive electric hoists (rated 7.5t) and gear-rack transmission, achieving a steady lifting speed of 0.5 m/min-substantially faster than conventional climbing frames.
  • Built-in synchronous control monitors load differentials and horizontal deviation: alerts trigger at ±15% load variation, with automatic shutdown at ±30%; height discrepancy beyond 30mm halts operation, in line with GB 50838-2015 requirements.
  • No repeated disassembly during floor transitions; each lift covers 4–5 storeys, reducing manual labor by up to 80% compared to traditional pipe scaffolding.
  • Verified on-site: a 30-storey residential project completed external works in 68 days, versus 112 days using conventional systems.

2.2 9-Tier Safety Protection

  • Dual-lock anti-fall catch engages within 0.1 seconds in case of hoist failure, supported by 4m-high HDPE anti-fall nets with impact resistance rated at 100kg.
  • Anti-tipping ensured by three wall-attached supports per lifting point, secured with M30 anchor bolts (concrete grade ≥C20), limiting horizontal displacement to ≤20mm.
  • Real-time load display across 12 lifting points; power cuts off automatically when load exceeds 30kN/m².
  • Wind resistance up to 12 m/s (Beaufort Force 6); hot-dip galvanized coating at 80μm withstands 1,800 hours of salt-spray testing per ASTM B117.

2.3 Heavy-Duty Full-Steel Structure

  • Main frame fabricated from Q355B high-tensile steel (yield strength 355MPa), with 3mm-thick anti-slip walkway plates-supports up to two workers plus 500kg of materials per square metre.
  • Removable diagonal braces (45°) and 1.2m-high edge guardrails enable adaptation to curved facades and corner configurations.
  • Reinforced welded joints (6mm fillet) provide over 200 reuse cycles-significantly longer than semi-steel alternatives.
  • Five-year cost per m²: $22, compared to $30 for rental lightweight systems and $35 for traditional climbing frames-representing a 42% cost saving over the period.

2.4 Optimized Logistics and Site Efficiency

  • Dismantled modules measure 1.2m (width) × 2.0m (height), allowing up to 80 units to fit in a standard 10m container-40% more than conventional frames.
  • Pre-assembled components cut on-site setup time by 60%; a two-person crew can install 50m² within an 8-hour shift.
  • Shipping weight: 1 ton covers approximately 65m², with transport cost at $0.8/m² versus $1.5/m² for comparable systems.

 

Products Specifications

 

Parameter Attached Lifting Scaffold System Lightweight Integrated Platform Traditional Climbing Frame
Applicable Height 10–40 storeys (max 120m) 5–20 storeys (max 60m) 8–35 storeys (max 105m)
Lifting Speed 0.5 m/min (synchronous) 0.2 m/min (synchronous) 0.17 m/min (stepwise)
Load Capacity 30 kN/m² ≤0.5 kN/m² 20 kN/m²
Safety Devices 9-fold (fall, tipping, overload) 3-fold (basic guardrails) 5-fold (fall, tipping)
Material Q355B full steel Aluminium alloy + steel Semi-steel
Corrosion Resistance 1,800h salt-spray 1,200h salt-spray 1,500h salt-spray
Reuse Cycles 200+ 100+ 120+
5-Year Cost per m² $22 $30 $35

 

 

Core Components

 

1. Full-Steel Main Frame

  • Dimensions: 1.2m × 2.0m; tube OD 48.3mm, wall thickness 3.0mm.
  • Material: Q355B steel (elongation ≥20%, impact toughness ≥34J at -20°C).
  • Finish: Hot-dip galvanized; integrated guide rails for lifting alignment.
  • Unit weight: 28kg-40% heavier than semi-steel frames, with twice the structural strength.

2. Intelligent Lifting Unit

  • Electric hoist: rated 7.5t, 380V/50Hz.
  • Gear-rack transmission with PLC controller; synchronous error ≤5mm.
  • Equipped with emergency stop, overload and underload sensors.
  • Wireless remote control with effective range of 50m.

3. Wall-Attached Support Syste

  • Three supports per lifting point; M30 anchor bolts, 200mm length.
  • High-strength carbon steel, tensile grade 8.8.
  • Adjustable angle 0–15° to accommodate irregular building surfaces.
  • Compliant with concrete strength ≥C20 as per GB 50838-2015.

4. Safety Accessorie

  • Anti-fall nets: HDPE, 50mm×50mm mesh, breaking strength 15kN.
  • Walkway plates: 3mm anti-slip steel, rated 2kN/m².
  • Guardrails: 1.2m height with mid-rails, conforming to OSHA 1926.451.

 

FAQ (High-Rise Contractor Focus)

 

1. How does this system differ from lightweight integrated platforms?
Lightweight platforms (≤0.5kN/m²) are limited to tool and personnel access and are unsuitable for heavy-load operations such as concrete placement. Our system supports 30kN/m², handles materials and equipment simultaneously, and lifts at 2.5 times the speed-making it the preferred choice for high-rise heavy construction.

2. Does the system meet international safety standards?
Yes. It holds certifications under EN 12811-1 (EU), OSHA 1926.451 (USA), and GB 50838-2015 (China). The 9-tier protection system, including dual anti-fall locks and continuous load monitoring, has consistently passed all third-party inspections.

3. What is the minimum building height for application?
The system is optimized for buildings of 10 storeys or more (≥30m). For projects between 5 and 9 storeys, we offer alternative modular scaffolding solutions to ensure cost-effectiveness across different scales.

4. What are the MOQ and lead time?
Minimum order quantity is 20 units (covering approximately 50m²). Standard orders are dispatched within 5–7 days; custom configurations (e.g., curved frames) require 10–14 days. Complimentary on-site training and a 1-year warranty are included.

 

Shaanxi Flourish Industrial Co., Ltd. delivers an attached lifting scaffold system that combines intelligence, structural integrity, and field-proven performance-engineered to keep high-rise projects on schedule and within budget.

Hot Tags: Attached Lifting Scaffold System, China Attached Lifting Scaffold System manufacturers, suppliers, factory, aluminum ringlock scaffolding, Lifting Scaffolding Frame System, self climbing scaffolding system, kwikstage scaffolding boards, x frame scaffolding, aluminium quick stage scaffold