Adjustable Steel Formwork - The Efficiency Benchmark for Multi-Scenario Concrete Shaping
Adjustable Steel Formwork. Integrating "modular adjustable design + heavy-duty steel technology", it adapts to 500-3000mm full-spec component construction, reusable for over 300 times, reducing comprehensive costs by 60% compared to traditional wooden formwork.
1. Core Advantages: Redefining Formwork Construction Standards
1.1 Full-Dimensional Adjustability, Adapting to 99% Construction Scenarios
Adopting "panel + keel" modular design, the width is adjustable from 300mm to 1600mm in 50mm increments, and the height extends from 1200mm to 3000mm. Through corner buckle combination, it easily forms walls, square columns, rectangular beams and other structures . Equipped with 15mm film-coated plywood lining, which can be quickly replaced according to concrete surface requirements, no need for custom formwork, suitable for residential, bridge, tunnel and other projects.
1.2 Heavy-Duty Durability, 60% Cost Reduction per Use
The main body is made of 3mm thick Q335 cold-rolled steel (yield strength ≥345MPa), with keels reinforced by ∠63×63 equal-angle steel, formed by CO₂ gas shielded full welding, capable of withstanding 60kN/㎡ fresh concrete pressure . The surface undergoes double treatment of hot-dip galvanizing + electrostatic spraying, passing 480-hour salt spray test without rust, remaining intact after 3 years of outdoor construction. Reusable for over 300 times, reducing per-use cost by 60% compared to wooden formwork (1-3 uses).
1.3 10-Minute Quick Assembly, 40% Construction Period Reduction
Innovative Ztie™90 quick-lock system: panel splicing only requires hammering the buckle to fix, no bolt fastening. A 2-person team can assemble 1㎡ formwork in 10 minutes, saving 40% working time compared to traditional bolt connection . Equipped with precise scale marks, adjustable size error ≤2mm, concrete flatness reaches ±2mm, no secondary plastering needed, further shortening the construction period.
1.4 Full-Cycle Support, Zero Supply Chain Risk
With a monthly production capacity of 2000 tons, it supports 3-7 days fast delivery, and custom models (special size/color) are completed within 10 days. Provides 1-year warranty, with 24-hour response for weld cracking, panel deformation and other issues. Packed with bundling + moisture-proof film, suitable for 20ft/40ft container transportation, direct delivery to global ports .
2. Core Technical Parameters
|
Parameter Category |
Standard Configuration |
Custom Range |
|
Main Material |
Q335 Cold-Rolled Steel |
Optional Q235/Q335 |
|
Steel Thickness |
3mm |
2.5-4mm |
|
Adjustable Size (W×H) |
300-1600mm × 1200-3000mm |
200-2000mm × 1000-4000mm |
|
Adjustment Increment |
50mm |
10-100mm Adjustable |
|
Surface Treatment |
Hot-Dip Galvanizing + Electrostatic Spraying |
Hot-Dip Galvanizing Only/Custom Spray Color |
|
Rated Pressure |
60kN/㎡ |
80-120kN/㎡ |
|
Reuse Times |
≥300 Times |
≥500 Times (Thickened Model) |
|
Lining Panel |
15mm Film-Coated Plywood |
Plastic Film Board/Stainless Steel Plate |
|
Assembly Efficiency |
10㎡/Person·Hour |
- |
|
Warranty Period |
1 Year |
2 Years (Premium Model) |
3. Product Structure Analysis
3.1 Load-Bearing Core: Angle Steel Keel Frame
Welded "well-shaped" keel with ∠63×63×5mm equal-angle steel, lateral spacing ≤300mm, additional reinforcing ribs every 600mm longitudinally. Ensures deformation ≤1mm/m when bearing concrete lateral pressure, suitable for high-grade concrete pouring.
3.2 Adjustable Core: Modular Splicing System
Standard lock holes preset on panel edges, realizing horizontal/vertical splicing via quick-lock buckles. Equipped with 90°/135° special connectors at corners, adjustable shape without cutting, suitable for special-shaped components .
3.3 Durability Core: Dual Anti-Corrosion Process
First hot-dip galvanizing (zinc layer thickness ≥80μm), then epoxy resin powder spraying, forming a double anti-corrosion layer, resistant to humid, saline-alkali and other harsh construction environments, extending outdoor service life.
4. Operation & Maintenance Guide
4.1 Quick Assembly Steps
Select corresponding panels according to component size, splice horizontally via quick-lock buckles;
Install longitudinal keels for reinforcement, fix with special connectors at corners;
Check splicing gap (≤0.5mm), paste sealing strips to prevent grout leakage;
Demould 24 hours after pouring, buckle can be disassembled by hammering.
4.2 Maintenance Tips
Clean residual concrete with high-pressure water gun after demoulding, store after drying;
Repair rust paint in time when coating damage is found to avoid rust spread;
Place 10cm above the ground during long-term storage to avoid water immersion.
Choosing Shaanxi Flourish Industrial Co., ltd.'s Adjustable Steel Formwork means choosing the flexibility of "one formwork for multiple uses" and the economy of "repeated reuse". From residential walls to bridge piers, we accelerate every infrastructure project with precise design and reliable quality!



